Australia

Since switching to PowerPax in 2006 the 6,237 m2, 7 storey office facility in the heart of Canberra has seen increased energy efficiencies and increased reliability. The switch was made to PowerPax because of its part load energy efficiency.

When David Tasker, the general projects manager of Bennelong Real Estate Equity Fund was asked why they made the switch to PowerPax water cooled chillers his response was "because of the 50% energy savings at 60% load,  and because of the after sales support."

CLIENT
Bennelong Real Estate Equity Fund

PROJECT OUTCOMES
Increased Energy Efficiency
Excellent Service Support
Increased Reliability

INDUSTRY SECTOR
Office Facilities

PRODUCT USED
2 x PPW330-1

Burswood Casino is a large complex in which the air conditioning needs vary considerably from day to day. The PowerPax chiller has been positioned to accommodate these variations by running as lead chiller at its full capacitiy and providing excellent low load capabilities whilst offering a reduced maintenance solution. The extraordinary part load efficiencies and unloading capabilities of the PowerPax chiller allow it to precisely maintain the cooling load while optimizing energy efficiency.

CLIENT
Burswood Casino

PROJECT OUTCOMES
Extraordinary control over the cooled environment under both full and part load conditions
Made the low-load chiller redundant
Major energy savings at part load

INDUSTRY SECTOR
Entertainment

PRODUCT USED
1 x PPW2500-05

With the installation of a PPW440-2, water cooled chiller, Canberra Hospital has seen increased reliability.

CLIENT
Canberra Hospital

PROJECT OUTCOMES
Increased reliability
Increased efficiency

INDUSTRY SECTOR
Health Care

PRODUCT USED
PPW440-2

The changeover to PowerPax chillers in the existing HVAC system at Four Points by Sheraton in Sydney’s Darling Harbour achieved significant power savings and allowed very accurate monitoring and prediction of the absorbed power, courtesy of the unique part-load features of the PowerPax chillers. The plant totals approximately 2.2 MW and each of the two chillers was delivered in dual circuit option to the customer’s specification. Four Points by Sheraton has seen energy efficiency increases of 50%. With savings such as these, the switch to PowerPax chillers pays for itself very quickly.

CLIENT
Four Points by Sheraton

PROJECT OUTCOMES
Noise Reductions
50% Energy Savings

INDUSTRY SECTOR
Hospitality

PRODUCT USED
2 x PPW1165-4-2

Macquarie University started with the installation of 2 PowerPax chillers. These installations resulted in energy savings of 30% and increased reliability. The university has since installed another 7 PowerPax chillers, taking the total number of chillers installed to 9, in a variety of applications.

CLIENT
Macquarie University

PROJECT OUTCOMES
30% documented energy savings
Increased reliability

INDUSTRY SECTOR
Education

PRODUCT USED
2 x PPA215-1
1 x PPA250-1
2 x PPA440-2
1 x PPW740-3
1 x PPW1400-5
1 x PPW1000-2

The Museum of Sydney has two PowerPax air cooled chillers installed. The PowerPax air cooled range has the smallest footprint on the market and ultra-quiet fans, saving the Museum of Sydney space and significantly reducing noise levels.

CLIENT
Museum of Sydney

PROJECT OUTCOMES
Quiet operation
Space efficient

INDUSTRY SECTOR
Entertainment

PRODUCT USED
2 x PPA400-2

China

The installation of two PowerPax chillers has offered usefull redundancy to this yeast and bakery ingredients factory in China. In addition, energy efficiency and noise reduction are major benefits.

CLIENT
AB Mauri

PROJECT OUTCOMES
Redundancy
Energy efficiency
Noise reduction

INDUSTRY SECTOR
Industrial

PRODUCT USED
1 x PPW440-2
1 x PPW660-3

Papua New Guinea

Cooling one of Port Moresby's largest shopping centres. This upgrade to PowerPax cooling technology has seen increased reliability, increased energy efficiency and an upgrade to the latest HVAC equipment.

PROJECT OUTCOMES
Increased efficiency
Major technology upgrade

INDUSTRY SECTOR
Shopping centre